Back to all services
HEALTH, SAFETY & ENVIRONMENT (HSE)

Occupational Health & Safety (OHS) Equipment Inspection & Certification (PJK3 / Kemnaker)

Mandatory statutory safety inspection (Riksa Uji) and SILO/SIA operating permits for lifting equipment (forklifts, cranes), pressure vessels, boilers, electrical, lightning protection, and fire systems.

10–25 Days Starting from IDR 5 Million / unit
What's Included

What this service covers

Inspections led by certified Ministry of Manpower OHS Specialist Inspectors
Non-Destructive Testing (UT Thickness Measurement, Magnetic Particle Inspection)
Static and dynamic load testing using calibrated test weights
Lightning grounding resistance and electrical insulation safety testing
Statutory representation before regional Manpower Labour Inspectorates
Package Scope

What's included in this package

Lifting Equipment Inspection (Forklifts, Cranes, Hoists)

Load testing and SILO operating permits for material handling equipment.

7–14 Days

Pressure Vessels, Storage Tanks & Boilers

Hydrostatic testing, UT thickness checks, and statutory steam vessel licensing.

10–20 Days

Lightning Protection & Plant Electrical Inspection

Grounding resistance and electrical switchgear statutory safety certification.

5–10 Days

Fire Protection Systems (Hydrants, Sprinklers, Alarms)

Flow rate testing, pump pressure checks, and fire safety compliance certificates.

7–14 Days

Certified Operator Licenses (SIO Kemnaker)

Statutory training and license issuance for forklift, crane, boiler, and welding operators.

14–30 Days
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Machinery specifications and manufacturer manual books
Electrical single-line and piping & instrumentation diagrams (P&ID)
Previous inspection records / expiring SILO licenses
Certified operator licenses (SIO) for equipment operators
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

How often must lifting equipment be recertified?
Forklifts and cranes require annual statutory inspection and bi-annual proof load testing.
What is the consequence of operating machinery without valid SILO permits?
Labour inspectors can issue stop-work orders, and in the event of an industrial accident, corporate management faces penal liability under Law No. 1/1970.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID