Licensing Methodology. Structured, Measurable & SLA-Guaranteed.
Eliminating bureaucratic uncertainty through 5 standardized operational phases tested across hundreds of industrial projects in Indonesia. From zero-cost preliminary feasibility audits to official barcode-verified decree issuance.
5-Phase Enterprise Permitting Execution
Each phase delivers tangible outputs, firm SLA turnaround times, and proactive progress reporting.
Pre-Assessment & Gap Analysis (Zero Upfront Cost)
Comprehensive review of business activities, KBLI 2025 classification, RDTR / KKPR spatial zoning, environmental permit screening (PP 22/2021), and identification of all sectoral PB-UMKU obligations.
- Statutory Regulatory Gap Analysis Matrix
- Permit Mapping & Document Requirements Checklist
- 3-Layer Cost Architecture Proposal (RAB) & SLA Timeline
Technical Studies, Lab Testing & Document Drafting
Field surveys by certified LPJK/KTPA specialists, baseline sampling at KAN ISO 17025 accredited laboratories, WGS84 polygon shapefile mapping, and comprehensive engineering drafting.
- Complete Technical Study Book / Formulir
- Spatial Shapefile Package WGS84 (.shp, .shx, .dbf, .prj)
- KAN Accredited Laboratory Test Reports (LHU)
National Portal Registration & Administrative Verification
Digital dossier submission into relevant ministerial portals (OSS-RBA, PUPR SIMBG, KLHK AMDALnet, Ministry of Transportation, SIINas) with intensive administrative validation assistance.
- Official National Portal Submission Receipts
- Minutes of Administrative Completeness (BAK)
- Technical Review / Plenary Hearing Schedule
Technical Plenary Defense & Field Site Inspection
Technical defense and presentation before ministerial review committees (ATR/BPN FPRP, AMDAL Evaluation Commission, PUPR TPA/TPT experts, Kemnaker K3 inspectors) including physical site verification.
- Plenary Hearing Minutes & Official Recommendations
- Fast-Track Revision Dossier (if revisions are noted)
- Technical Approval Recommendation Decree
Definitive Decree Issuance & Full Project Handover
Issuance of official Ministerial Decrees (SK), Operational Feasibility Certificates (SLO), verified Standard Certificates with OSS QR codes, and full dossier handover with periodic compliance guidelines.
- Official Definitive Permit Decree / Verified Certificate
- Official Handover Minutes (BAST)
- Corporate Compliance Calendar (Periodic Reporting Schedule)
Dedicated Project Manager
A single senior technical project manager to lead your project end-to-end. No fragmented handoffs; regular milestone updates delivered directly to your management.
Contractual SLA Commitment
Project timelines are formally set in the legal work contract. Bizmark guarantees full assistance until permits are issued without additional fees if technical delays occur on our part.
Milestone-Based Payments
Secure staged payment schedule based on real deliverables: DP 30-50%, Technical Submission/Hearing 30%, and Final Balance 20-40% upon definitive permit issuance and validation.
Get Your Free Gap Analysis Matrix Today
Submit your business profile and location details. Our senior consulting team will prepare a regulatory compliance roadmap and 3-layer cost estimate completely free of charge.