Back to all services
ENVIRONMENT & ESG

Technical Approvals (Pertek) & Operational Feasibility Letters (SLO) - PP 22/2021

Comprehensive technical permitting and operational sign-offs for industrial wastewater discharge (WWTP), air emissions, and hazardous waste facilities under PP 22/2021.

30–60 Days Starting from IDR 25 Million
What's Included

What this service covers

Prepared by certified environmental engineering experts
Comprehensive WWTP mass balance & assimilative capacity modeling
Stack emission dispersion simulation (AERMOD)
KAN-accredited environmental laboratory analytical sampling
End-to-end trial run monitoring and SLO site audit representation
Package Scope

What's included in this package

Wastewater Discharge Pertek & SLO (WWTP)

Engineering approval and operational sign-off for industrial wastewater treatment.

30–60 Days

Flue Gas & Stack Emission Pertek & SLO

Industrial stack emission compliance for boilers, furnaces, and generators.

30–45 Days

Hazardous Waste Storage Technical Specs (Rintek)

Technical compliance specifications for on-site hazardous waste storage facilities.

20–35 Days

Hazardous Waste Recovery & Processing Pertek

Technical approvals for hazardous waste co-processing, recycling, and recovery.

45–90 Days
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Existing Environmental Approval (AMDAL / UKL-UPL)
Process flow diagrams and plant water/mass balance
Technical blueprints of WWTP, stack, or hazardous waste storage
Certified laboratory test reports of wastewater and flue gas
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

What is the distinction between Pertek and SLO?
Pertek is an engineering design approval issued during the planning stage, while SLO is the operational feasibility sign-off issued after constructing and testing the facility.
How long does SLO site verification take?
Site verification is typically scheduled within 7–14 days following successful completion of the commissioning trial run.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID