Back to all services
SPATIAL & PROPERTY

Spatial Conformity & KKPR Permitting Services (PKKPR & Zoning Approval)

Comprehensive spatial suitability approval (KKPR/PKKPR), BPN technical considerations, flood level assessment, and master site plan approval across Indonesia.

20–45 Days Starting from IDR 15 Million
What's Included

What this service covers

Real-time digital RDTR/RTRW spatial overlay audit
Professional GIS Polygon Shapefile (.shp) mapping
BPN Land Office technical hearing representation
Forum Penataan Ruang (FPR) municipal hearing defense
Package Scope

What's included in this package

Automatic KKPR Confirmation (Digital RDTR)

Fast-track spatial confirmation in digitized industrial & urban zones.

1–3 Days

Manual PKKPR & FPR Hearing Package

Complete spatial approval through technical land surveys and municipal FPR hearings.

20–45 Days

BPN Land Technical Consideration (Pertek)

Land suitability and status verification by National Land Agency.

14–25 Days

Flood Level & Site Plan PUPR Approval

Hydrology run-off calculation and site plan drainage endorsement.

14–30 Days
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Company legal documents (Articles of Association, NIB, Tax ID)
Land deed / title / lease agreement
Boundary coordinates (minimum 4 polygon points)
Site development masterplan layout
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

What is the difference between Automatic KKPR and Manual PKKPR?
Automatic KKPR applies in zones with digitized detailed spatial plans (RDTR) integrated into OSS. Manual PKKPR is required in areas without digitized RDTR and involves spatial committee evaluations.
How long is the KKPR permit valid?
An approved PKKPR decree is valid for 3 (three) years from the date of issuance to secure building permits and land rights.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID