Statutory operating permits for on-site industrial power plants and emergency backup generators (>500 kVA), Operational Feasibility Certification (SLO), and Mining Services Licenses (IUJP).

20–45 Days Starting from IDR 15 Million
What's Included

What this service covers

Statutory operating licensing for generators >500 kVA (Emergency / Continuous)
Statutory notification compliance for generators up to 500 kVA
Commissioning inspection execution with accredited Technical Inspection Agencies (LIT)
Mining Services Business License (IUJP) procurement support
Package Scope

What's included in this package

Captive Power Operating License (>500 kVA)

Official industrial power generator operating license from Ministry of Energy.

20–45 Days

Operational Feasibility Certificate (SLO ESDM)

Statutory commissioning certificate for power generators and substations.

14–30 Days

Mining Services Business License (IUJP)

Statutory licensing for mining contractors and heavy equipment operators.

30–60 Days
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Generator/transformer technical specification nameplates
Electrical Single-Line Diagram (SLD) signed by a certified electrical engineer
Environmental Approval (AMDAL / UKL-UPL) incorporating generator units
Plant layout indicating fuel storage and generator house locations
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

Are generators under 500 kVA required to hold operating licenses?
No, generators up to 500 kVA for private captive use only require a one-time formal reporting compliance rather than an operating license.
How long is an electrical SLO certificate valid?
An electrical installation SLO certificate is valid for 5 (five) years and must be renewed prior to expiry.