Professional Service

Land & Building Permits

Land acquisition advisory, building permits (PBG), and safety certificates (SLF) for foreign investors

Starting From
USD 5,000 - 25,000
Processing Time
30-90 days

Understanding Land & Building Permits

Essential insights for foreign investors in Indonesia

Land acquisition and building development in Indonesia involves navigating complex property rights structures that differ fundamentally from Western freehold systems.

Foreign entities cannot own land under Hak Milik (freehold title)—your options are Hak Guna Bangunan (HGB, building rights for 30 years, renewable), Hak Pakai (right to use, typically 25 years), or long-term lease arrangements. Each structure affects your asset valuation, financing options, and exit strategy. HGB on state land provides stronger rights than HGB on private land, while HGB in industrial estates often comes with pre-established infrastructure and streamlined permitting.

Building permit (PBG) processing requires coordination across multiple agencies—local spatial planning authority (for zoning compliance), environmental agency (for UKL-UPL clearance), fire department (for safety compliance), and often utilities providers (for connection capacity). Your architectural plans must comply with Indonesian building codes (SNI standards) while meeting your operational requirements. International firms often need to partner with locally-licensed Indonesian engineers to certify structural calculations and MEP designs.

The SLF (Certificate of Building Worthiness) is often overlooked but critical: Without SLF, your building cannot legally operate, insurance coverage may be void, and you cannot obtain operational licenses. SLF requires third-party inspection of completed construction—if your as-built differs from approved plans, you face costly rectification or acceptance of limited operational certificates.

We've prevented millions in remediation costs by conducting pre-acquisition land due diligence that uncovered ownership disputes, zoning violations, and environmental contamination. Our integrated approach coordinates legal (land rights), technical (building engineering), and regulatory (permit processing) expertise to de-risk your property development from site selection through operational handover.

What You'll Receive

Comprehensive land title due diligence and chain-of-ownership verification
Land rights structuring advice (HGB, Hak Pakai, lease options for foreign entities)
Building permit (PBG - Persetujuan Bangunan Gedung) approval
Certificate of building worthiness (SLF - Sertifikat Laik Fungsi)
Site plan approval (Rencana Tapak)
Location permit and environmental clearance coordination
Utility connection permits (electricity, water, gas)
Construction timeline coordination and inspection scheduling
Neighboring land owner notification and consent (if required)

Our Process

1

Land title verification and due diligence

2

Site plan and zoning clearance

3

Building permit application

4

Construction monitoring (optional)

5

SLF certification after completion

Required Documents

  • Land certificate (Sertifikat Hak Milik/HGB) or proof of ownership/lease rights
  • Complete architectural, structural, and MEP (mechanical, electrical, plumbing) building plans
  • Structural calculations certified by licensed engineer
  • Geotechnical/soil investigation report
  • Environmental clearance certificate (UKL-UPL minimum)
  • Site photos, topographic survey, and lot measurements
  • Fire safety and emergency exit plan
  • Construction method statement and timeline
  • Contractor license and qualifications (for PBG application)

Need Assistance?

Our investment consultants are ready to help you navigate Indonesia's regulatory landscape.

Service Information

Investment Range: USD 5,000 - 25,000
Timeline: 30-90 days
Market: Foreign Investment (PMA)
Consultation: Free

Ready to Start Your Investment Journey?

Get a free consultation and customized roadmap for your business in Indonesia